Permits

A building permit is a type of authorization that must be granted by the Building Division before the construction of a new building, or to enlarge, alter or repair an existing building. Permits are for your safety and protection.

Also, work done without a permit is illegal and can pose serious complications for your homeowner’s insurance or when you sell your home. By obtaining a Building Permit, you avoid legal and financial liabilities.


 

 

When to Get a Building Permit

Typically, all new construction, remodels or alterations to any building, plumbing system, mechanical system or electrical system needs a building permit.  Replacing a water heater or a heating system (boiler, furnace, etc.) requires a permit.  Onsite Wastewater Treatment Systems (OWTS or better known as Septic) require a permit for new installations and repairs or alterations.

Electrical (whether the work is new or adding to or replacing) require permits through the State of Colorado.

Rio Blanco County offers the option of obtaining a Rural Building Exemption instead of a building permit for some buildings such as detached garages and shops.

If you are unsure if your project requires a permit or can be approved for a Rural Building Exemption, please contact us.


Permit Process

  1. You or your authorized agent (contractor or other) will submit your complete application and drawings to the Building Division staff for the plan review process.
  2. For simple construction installation such as wood stoves, gas lines, new heating and cooling units, and most plumbing, the Building Division reviews and approves permit applications with no or very little plan requirements.
  3. For more complicated projects such as new buildings, remodels, additions, the review process requires two complete sets of construction plans.
  4. After the application and plans are received, they will be reviewed by both divisions of the Community Development Department and you will be notified of any questions or additional information required to complete the application. After the application and plans have been approved you will be notified that the permit is ready to issue and what the required fee amount will be. (All fees must be paid before the permit can be issued)
  5. The Building Division staff reviews applications for completeness, reviews plans and issues the Building Permits and inspects each phase of construction for safety and conformance to the Rio Blanco County building, plumbing, and mechanical codes.
  6. The Planning Division looks at the placement of new structures on property to verify zoning requirements such as lot size and coverage, density, building setbacks, and height limits. Some Zoning restrictions may require a use permit or variance.

Please contact us to schedule a time to discuss your project, and we can help you understand what your plans must show for your specific project.

Please refer to the current Rio Blanco County Master Fee Schedule as needed.